Treveia Nuvali by Ayala Land
Less than an hour south from Metro Manila is Nuvali, Ayala Land's vision of a new, fully-sustainable metropolis of the future. Nuvali represents the evolution in Ayala Land's approach to master-planning and is the first large-scale development in the Philippines to be built in the principles of sustainable design.
Alveo Land Corporation sets its mark in Nuvali with Treveia - a residential haven that introduces a lifestyle that warmly nurtures close family and community ties in a healthy, upscale and eco-friendly environment.
Eco-Friendly
In-line with Nuvali’s sustainability campaign, Treveia is designed to be an eco-friendly living environment with sustainable elements infused in the design. Living an eco-friendly lifestyle will be easy if not effortless for Treveia’s residents through forward planning of community facilities, utilities and educational programs.
Family and Community Nurturing
Treveia will foster relationships within the community. Treveia’s extensive and innovative open spaces will give residents a venue to nurture the bond between family and neighbors. Highlighted by its 2.5 hectare Grand Central Park and nature-themed pocket parks, Treveia will provide much needed space for community building among its residents.
Life is at Treveia in Nuvali
Treveia, which stands for the main ideals of the project: urban conveniences, eco-friendliness, and a family-nurturing community, is Alveo Land's first venture in Nuvali-a sprawling new metropolis seven times the size of Makati CBD to rise in the South. Nuvali is touted to be Ayala Land's largest integrated regional hub to date that is designed to foster social, economic, and environmental sustainability.
Being located at the center of Nuvali and just beside the future site of Xavier School, Treveia allows its residents easy access to the commercial, educational, civic and entertainment centers of the neo-metropolis. Nuvali's tech-ready environment and infrastructure also assures residents of Treveia of a lifestyle that is fit for the future.
Treveia offers these conveniences while still being able to remain faithful to their eco-friendly proposition by incorporating energy efficient and water conserving facilities in its design and construction. Technology such as double-piping and active stormwater management systems allows the re-use of water for irrigation, thus enabling the development to maximize its resources with minimal impact to the environment.
Ushering future residents home via its 40-meter grand entrance that boasts of double-tree lined roadways and special paving, the entire subdivision will be connected by tree-lined bike paths and pedestrian gardens.
By providing pleasant tree-shaded walks and safe biking conditions such as bike racks for parking, residents will be encouraged to walk and use alternative means of transportation that will promote Treveia's vision of an eco-friendly and energy efficient community.
Designed also to foster and strengthen family as well as community relationships, Treveia will offer to its residents a 2.5-hectare Central Park featuring the Grand Clubhouse, a 40-meter lap pool, a kiddie pool with an interactive water play area, a reflection pond, basketball court, lounge areas, gardens, sculptural features and a multi-purpose open field for football games, kite flying, town fiestas and other large gatherings. The Grand Clubhouse comes complete with function rooms, fitness gyms, theater and snack bar. A big draw for those who value community interaction and neighborhood relationships are Treveia's four themed pocket parks that represent different elements of nature: The Rain Garden Park representing water, The Woodland Park for wood, The Hillock Park for earth and The Wind Chime Park for wind.
Price range lot only: P2.5M - P7.0M
Location
NUVALI is a 50-minute drive from Makati through the Sta. Rosa Exit of the South Luzon Expressway (SLEX). By the first half of 2008, a road will connect NUVALI directly to the Mamplasan Exit of the SLEX.
Master Plan
Phasing Plan
Lot Plan
Lot Configuration
Architectural Design Theme
Homes at Treveia Nuvali are modern and elegant reflective of culture and values.
Highlights
Parks & Open Spaces
Subdivision Features
Cluster Developments
Utilities
Sustainability Elements
Energy Efficiency
Water Reuse and Stormwater Management
Environmental Programs
About Nuvali
Named simply Nuvali (‘nouveau’ or ‘new’ venture of Ayala Land, Inc.), the supra-development will be a vast complex of low-rise structures that integrates all the dynamics of working, living, and playing in a serene and close-to-nature setting.
Nuvali is a development backed by the expertise and heritage of Ayala Land, the same people behind the country’s leading and thriving business districts in the Makati CBD, Bonifacio Global City, Alabang and the Cebu Business Park. Ayala Land’s newest development showcases how the metropolitan lifestyle can in fact enhance rather than erode the natural environment and the social ties that bind a community.
Masterplan
Nuvali is a self sufficient community in Laguna that covers all major areas — residential, business, commercial, recreational, and educational. Homes, office buildings, shops, restaurants, and schools are attuned to each other through the rich natural environment, technological hubs, and people-oriented infrastructure. It is a harmony of productivity and sustainability, where family, work, and leisure are seamlessly integrated in a diverse vibrant landscape.
Location
Nuvali is a 1,600 hectare development envisioned to be the country’s next urban center. It is located in Laguna and is covered by the cities of Sta. Rosa and Calamba. It is only 40 kms away from Makati (50 minutes) and 25 kms from Alabang (30 minutes). Nuvali is along the Sta. Rosa-Tagaytay Road.
From Metro Manila, it is accessible via South Luzon Expressway with the following exit points:
Project Concept
As the next urban center, Nuvali will integrate a mix of land uses which are vital to support a modern metropolis. It will have a central business district with traditional office buildings and business process outsourcing campuses, retail centers, residential developments, schools, institutional and civic areas, among others.
Nuvali will redefine urban living by hinging itself upon sustainability to distinguish itself from cities as we know them — highly dense urban centers. This means that Nuvali will contain the elements that bring forth economic prosperity, while keeping check of social needs to foster true community building, all in an ecologically sound environment.
Ayala Land believes that only in striking this balance will it assure the value appreciation of Nuvali for generations to come. This is the same long-term outlook in large scale developments that enabled the company to shape the Makati Central Business District, Ayala Alabang and Madrigal Business Park, Cebu Business Park, and Bonifacio Global City. With this vision of sustainability, Ayala Land finds assurance in its plans for Nuvali as the up and coming metropolis.
The Nuvali 2.5-hectare Grand Central Park
Components
Business and Technology Campus – located near the main entry along Sta. Rosa Tagaytay road, this will spur the growth of the Nuvali community
Residential: A thriving hub
Nuvali benefits from many amenities present in the local area. Existing shops, restaurants, parks, schools, and sports centers are open to the community. The area also enjoys a rich cultural heritage, making Nuvali part of an active tourism district.
All three brands of Ayala land will be building at Nuvali: Ayala Land Premier for high-end residences (through the Abrio), Community Innovations for upper middle-class homes (through the Treveia), and Avida for middle-class housing (through Avida Settings).
The Abrio will be priced at around 10 thousand pesos to 11 thousand pesos per square meter. The area to be opened for Abrio is 70 hectares, comprising 379 lots in total.
The Treveia will be alloted 60 hectares which is envisioned for future residents to be in touch with urban living. With the development are 4 nature themed parks and a main clubhouse.
The Avida Settings will devote 2 hectares to open spaces. Avida Setting’s green ribbons and courtyards give family members the opportunity to bolster relationships through a novel design for homes that incorporates nature in residential living. The house design is modern contemporary with a timeless appeal.
Institutional
Xavier School (Elementary and High School) – occupying a 15-hectare property in the central portion of Nuvali, targeted to be opened by 2012.
Other features
Environmental Sustainability Features
Economic Sustainablity Features
Social Sustainability Features
About the Developer
Ayala Land, Inc. is the real estate arm of the Ayala Corporation, one of the Philippines' biggest and well-established business conglomerates. Established in 1834, Ayala Corporation consists of five major subsidiaries and three affiliates that are leading players in the areas of banking, insurance, automotive, real estate, telecommunications, information technology and water utilities.
Its real estate interests are consolidated under its full-owned subsidiary, Ayala Land, Inc. whose projects include:
Through its over 50 years of experience in real estate, Ayala Land, Inc. has earned a reputation as the country's leading real estate developer. It is primarily credited for Makati City's metamorphosis from grasslands back in the 1940's into the premiere business district it is today. To this day, it is the preferred business location of the most prestigious corporate, commercial and residential addresses, site of many international hotel chains and home to exclusive high-end residential areas developed by the Ayala group over the past 50 years.
Contact Us
Ayala Land Premier
Within Metro Manila (+632) 848-5000;
Outside Metro Manila 1-800-10-848 5000
Email: ask@ayalalandpremier.com
Alveo
Within Metro Manila (+632) 848 5100;
Outside Metro Manila 1-800-10 848 5100
Email: cii.sales@ayalaland.com.ph
Avida
Within Metro Manila (+632) 848 5200;
Outside Metro Manila 1-800-10 848 5200
Email: info@avidaland.com
Amaia
Within Metro Manila (+632) 403 7433 or (+632) 403 7644
Attention Our Valued Users
The particulars and visuals shown herein are intended to give a general idea of the project and as such are not to be relied upon as statements of fact. While such particulars and details on present plans which have been prepared with utmost care and given in good faith, buyers are invited to verify their factual correctness and subsequent changes, if any. The contents herein are subject to change without prior notice and do not constitute part of an offer or contract. For more information please see our Terms of Use.